Stockpiling & Loading Facilities
           HOME        |          About Us         |          Business Divisions            |          Careers           |           Media Centre          |            Social Responsibility                 
Coal delivered from the pits to the preaparation plant passes through two bridges based on physical characteristic of the coal that is mined. Comprising 90% of total production output, clean coal is fed to a 200 TPH crushing plant and big gravity screens to obtain the desired product size. Stockpile temperature is also regularly monitered. The Preparation Plant is also equipped with metal detectors to prevent iron and other metallic materials from contaminating the product coal.
For Enquiries, please contact us on the coordinates below.
Headquaters Office

Mutaiyas Group
525A, Jalan Kuala Ketil
Pekan Lama
08000 SUNGAI PETANI
Kedah Darulaman
Malaysia
Send us a mail

mrvasu@mutaiya.com
mutaiya1@yahoo.com
att : Mr Vasudevan
Find out more about MUTAIYAS GROUP and its various business
Phone or Fax us

T : +604-421 3620
F : +04-422 6360
HP : +06012 226 3620

Ó2016 MUTAIYAS GROUP. All Rights Reserved.

Barging & Transhipment
The coal is stacked at DTKB stockpile at Kerang river bed. The coal stockyard area is about 6 hectors out of 22 hectors of leased stockyard has a capacity of 0.25 million metric tones. DTKB plans to install 2 numbers of 2000 tons per hour capacity of land over conveyors. The product of coal shall be loaded to barge load jetty through this mechanised conveyor.

 
 
About Us
Preparation of Plant
 
Barge Jetty is located at S 02o 12' 904" - E 116o 08' 409", in river bed of Kerang River. The Jetty is about 200 meters away from our stock yard. It can facilitate the barge with size of 91.50m x 24.40m and tug boat size of 28.50m x 8m. About 8000 mt in 300 feet pontoon can duck at the jetty at all times. Loading duration for 8000 mt pontoon is around 4 to 5 hours.
Coal shall be loaded into barges and transported to bulk cargo vessels at the designated transhipment areas of Teluk Apar (approx. 7 miles away from our jetty) which is the open-sea anchorage can accommodate ares is approx. 3 hours. The rate of loading from barges to bulk cargo vessels is 8000 mt per day for handmax vessels and up to 10,000 mt per day for panamax size.